Irrigation-Surveying Engineering Company

Projects and activities carried out abroad (Turkmenistan)

1- Studies, design, and implementation of drip irrigation system related to the project of the Ministry of Oil and Gas (Green Belt – Ashgabat city) Ashgabat city Turquoise road between Ashgabat road Bakro area – Gok Tappeh city with an area of ​​1000 hectares (1998).

2- Studies, design and implementation of drip irrigation system related to the project of the Ministry of Agriculture (Green Belt – Ashgabat city) Turquoise road around the orphanage with an area of ​​400 hectares (1998).

3- Studies on design, supervision and implementation of drip irrigation system related to the project of the Ministry of Defense (Green Belt – Ashgabat city) of Bakro road with an area of ​​100 hectares (1998).

4- Studies, design and implementation of drip irrigation system related to the project of the Ministry of Foreign Affairs (Green Belt – Ashgabat city) between the newly constructed GokTappeh road to the Iran terminal with an area of ​​250 hectares (1998).

5- Studies, design and implementation of drip irrigation system related to (Mayor of Kemarbande Sabz – Ashgabat city) Barzangi Road of National Park with an area of ​​200  hectares (1999).

6- Studies, design and improvement of sprinkler irrigation system of Kopeh Dagh sports stadium with an area of ​​5 hectares (1999).

7- Supplying and planting more than two million non-fruitful seedlings (pine, cypress, etc.) for the mentioned projects and care and maintenance for one year.

8- Studies, design and implementation of sprinkler irrigation system in Rouhabad city with an area of ​​150 hectares per year (2002).

9- Participating in the construction of a student dormitory for 250 people and the Bahar Lee Khatmeh city sports complex (2012).

10- Participating in the construction of a treatment plant and the implementation of water and sewage lines in Bahar Lee city with an area of ​​85 hectares (2013).

11- Participating in the construction of pumping station and drinking water transmission line in Gok Tappeh city with a length of 45 km (2014).

12- Participating in the construction of a student dormitory for 350 people and a sports complex in the city of Tajan (2014).

13- Participating in the construction of drinking water transmission lines in Ashgabat city through two routes, Giami and Chandabil, along 28. Km with metal pipes and GRP size 120 mm in (2014).

14- Participating in the construction of city highways (Ashgabat – Tajan – Mari) with a length of 90 km (2015).

Projects and activities carried out in the interior of the country (Iran)

A- Urban section

1- Studying and modifying the old plan of collecting catchments of Kermanshah city from the towns around the central river (Qarasu) with an area of ​​4,000 hectares by locating a wastewater treatment plant and determining the transportation routes along 15 km.

2- Studying and modifying the plan of the old system of collecting catchments of cities (Langrud, Chamkhaleh) from the central river by locating the wastewater treatment plant and determining the route of the transmission line with a length of 80 km.

3- Study of collecting catchments of cities (Meygon, Oshan, Fasham and Lavasan) and the  surrounding lands to Jajroud river at the entrance of Latian dam by locating a wastewater  treatment plant and determining the route of the transmission line with a length of 170 km.

4- Mapping and modifying the old urban water and sewage collection plan of Paveh city (Kermanshah province), 200 hectares.

5- Surveying, designing and modifying the irrigation network of Tehran International Exhibition at the level of 50 hectares (2003).

6- Study and design of water transfer line of Rasht and Anzali cities from Saravan pumping station to Lakan new treatment plant (2007).

B – Agricultural sector

1- Preliminary study and design of rivers and agricultural lands of Sanghar Keliai plain (Kermanshah province), Soleimanshah dam, for transferring agricultural irrigation to an area of ​​twenty-five thousand hectares.

2- Surveying, designing and implementing a pressurized irrigation system in Tehran province with an area of ​​four hundred hectares and supervising the implementation of a pressurized irrigation system of three thousand hectares annually (2000-2001).

3- Surveying, design and implementation of pressurized irrigation in small plots of 50 hectares in Pakdasht, Tehran (2003 and 2002).

4- Surveying, designing and implementing sprinkler and drip irrigation of northern tea gardens at the level of 45 hectares.

5- Surveying, design and implementation of drip irrigation of Lushan olive groves in Guilan province with an area of ​​80 hectares 0

6- Improving the traditional irrigation system with a concrete stream from the lands (paddy fields) of Charam plain (Kohgiluyeh and Boyer-Ahmad) one hundred and fifty hectares.

7- Designing traditional streams to concrete and piping with a length of 85 km in Pakdasht (2003 and 2002).

8- Surveying, designing and implementing leveling of agricultural lands in 350 hectares of Pakdasht years (2003 and 2002).

9- Designing traditional streams to concrete and piping with an area of ​​22 km in Robat Karim (2003 and 2002).

10- Study to prevent the destruction of border river floods (Helmand, Afghanistan) to the surrounding areas and rehabilitation of Hamoon wetland (45 km).

C – Transmission lines and roads:

1- Study of power transmission line from Nikshahr power plant in Sistan and Baluchestan province to Jakigur city in 1992 Preparation of topographic map: 2000: 1 with a length of 150 km

2- Implementing the tower locations of the Nikshahr to Jackie Gore transmission line in 1993.

3- Study and preparation of topographic map of power transmission line from Baghin Kerman power station to Jiroft in 1373 and preparation of topographic map of the second transmission line Bravat-Bam to Sarvestan three roads connected to Baghin-Jiroft route with a length of 95 km in 1374.

4- Study and preparation of international road map of Guilan province from Sarvan to Fooman city with a length of 48 km in 1997.